0%
Achievement

318
wind turbines
are under the
guarantee service
maintenance
of the company

Achievement

We produce
6 types
of modern megawatt
turbines: 2.0, 2.5, 3.0, 3.2,
3.3 and 4.5 MW.

Achievement

318
wind turbines
are under the
guarantee service
maintenance
of the company

Achievement
Award

The FWT 3000
turbine is in the
top 5
of the Wind Power
Monthly 2015 ranking

Achievement

The industrial capacities
of the company are
5 000 m².
We realize the projects
of any difficulty –
from a single turbine
to multi-megawatt
park on a turn-key basis.

Achievement

“Wind Parks of Ukraine”
was the first and at this
stage the only company
in Ukraine that received
10%
supplement on the
“green” tariff for the
use of equipment produced
in Ukraine.

Achievement

500
staff members
work in “Wind Parks
of Ukraine”

Achievement

289 MW
is a total capacity
of all wind parks built
by "Wind Parks of Ukraine".
This is the largest portfolio
of generating parks in the CIS.

Achievement

22
turbines with a total
capacity of 2.0 MW
designed for extremely
low temperatures
(down to -40° C) were
installed and commissioned
in Kazakhstan in 2014.

Achievement

48.8 million
is the loan amount that
our company (the first among
the post-soviet countries)
received from the European
Bank for Reconstruction
and Development

Achievement

1st Ukrainian
multi-megawatt
wind park with
a total capacity of
57.7 MW

Achievement

The total
investment is over
420 million euros

Achievement

In its history
“Wind Parks of Ukraine”
produced
2 231.21
million kWh,
which was equal to
631 108 thousands m³ of gas
or to 1 156,528 tons of coal.