0%
The first wind park
in the post-soviet countries,
that obtained funding from
the European Bank for
Reconstruction and Development
The total capacity
of 210 turbines
built in 1998-2004
is 25.5 MW with the
concession till 2054
Ветропарк Керченский

Wind Park Kerchensky

Ostaninska wind station

Location

Crimea,
Leninsky
district

Calendar

Construction

2012-2013

power

Implementation
from 01.12.2013

Turbo

Turbines

10 turbines

2.5 MW each

Calendar

Total capacity

25 MW