0%
The first wind park
in the post-soviet countries,
that obtained funding from
the European Bank for
Reconstruction and Development
The total capacity
of 210 turbines
built in 1998-2004
is 25.5 MW with the
concession till 2054
Ветропарк Причерноморский

Wind Park Prichernomorskiy

Ochakiv, Tuzly, Lyman and Olvia wind station

Location

Mykolaiv region


Calendar

Construction

2016-2020

power

Implementation
from 11.04.2020

Turbo

Turbines: 3 turbines each 2.5 MW,
2 turbines each 3 MW, 5 turbines each 3.2 MW,
2 turbines each 3.3 MW, 1 turbine 3.5 MW,
2 turbines each 4.8 MW

Calendar

Total capacity

42.8 MW